Our Shipping Case Studies & Operations Yard
Arrowline Logistics backs performance promises with audited results. Review detailed challenge-to-result logs of over-dimensional cargo moves, bulk loops, and quick express dispatches across India.
Audited Logistical Case Studies
All records validated by our Mundra Port compliance agents
Transporting 85-Ton Over-Dimensional Boilers from Mundra to Salem
Corridor: Mundra Port, Gujarat to Salem, Tamil NaduOverview: Moved 3 over-dimensional industrial boilers weighing 85 metric tons each across 1,900 kilometers with zero clearance delays.
The shipment measured 5.8m width and 6.2m height, encountering low bridges, overhead power lines, and multi-state permit requirements across 5 states.
Arrowline performed comprehensive route feasibility surveys, deployed hydraulic modular multi-axle trailers, and coordinated with state utility teams for real-time overhead line lifting.
Delivered safely in 18 days (3 days ahead of schedule), saving the client ₹12 Lakhs in port demurrage and site delay penalties.

Optimized Coastal-Road Multimodal Loop for Bulk Gypsum Cargo
Corridor: Mundra Port to Chennai & Coimbatore HubsOverview: Restructured a monthly 8,000-ton bulk gypsum supply chain by switching from pure road trucking to a maritime-road multimodal route.
Long-haul highway trucking was facing rising diesel costs, toll charges, and erratic delivery timelines due to highway congestion.
We engineered a coastal shipping route from Mundra Port to Chennai Port, with synchronized local FTL road trailers for last-mile delivery to factories.
Logistics costs were reduced by 32%, carbon footprint dropped by ~45%, and supply schedule reliability reached 100%.

Time-Critical Pharma Express Cargo from Gujarat to Delhi Airport
Corridor: Ahmedabad / Mundra to Delhi International Cargo TerminalOverview: Executed temperature-controlled express transportation for sensitive active pharmaceutical ingredients (API) within a 14-hour airside window.
Strict 2°C to 8°C thermal constraints with strict zero-tolerance QA criteria and tight flight boarding schedules.
Deployed specialized temperature-controlled GPS-monitored container trucks with dual refrigeration backups and live temperature telemetry.
Delivered in 12.5 hours directly to the airport cargo terminal with 100% temperature compliance and zero transit deviations.

Containerized Rail Freight Corridor for Solar EPC Equipment
Corridor: Mundra Port to Jodhpur Solar Park, RajasthanOverview: Coordinated rail movement of 220 TEU solar module containers from port directly to inland rail terminal with seamless trailer transfer.
High vessel volume arriving in tight sequence required rapid port clearance to prevent port detention charges.
Arrowline coordinated direct vessel-to-rail loading at Mundra port, routing dedicated container rakes straight to Rajasthan dry-port.
100% of 220 containers cleared and dispatched within 72 hours, saving over ₹18 Lakhs in potential container detention.
Operational Photo Gallery
Explore high-resolution photos of our coastal vessels, container trains, and custom operations yards.
Mundra PortMundra Port Container Berth Operations
Direct vessel-to-trailer loading of 40-foot containers at Adani Mundra Port.
Road FleetFTL Heavy Fleet on Expressway Corridor
GPS-enabled FTL high-cube container trucks navigating national express transport corridors.
ODC Cargo85-Ton ODC Cargo Transport
Executing synchronized project cargo logistics using heavy modular multi-axle pullers with safety escorts.
Rail FreightMultimodal Rail Freight Terminal Loading
Direct rail-to-road loading operations in coordination with Indian Railways and CONCOR private freight rail links.
CustomsCustoms Inspection & Port Gate Dispatch
Pre-shipment custom document checks and container seal verifications performed by Arrowline CHA agents.
Need similar secure logistics in India?
Our planners compile route surveys, lashing certifications, and port clearance tailored to your industry.